Agenda item

Planning Application - EPF/0930/21 Little Oaks, Abridge Road, Theydon Bois, Epping RM4 1TX

To consider the attached report for a replacement dwelling.

Minutes:

 

APPLICATION No:

EPF/0930/21

 

SITE ADDRESS:

Little Oaks

Abridge Road

Theydon Bois

Epping

RM4 1TX

 

PARISH:

Theydon Bois

 

WARD:

Theydon Bois

 

 

DESCRIPTION OF PROPOSAL:

Replacement dwelling.

 

RECOMMENDED DECISION:

Grant Permission (With Conditions)

 

Click on the link below to view related plans and documents for this case:

http://planpub.eppingforestdc.gov.uk/NIM.websearch/ExternalEntryPoint.aspx?SEARCH_TYPE=1&DOC_CLASS_CODE=PL&FOLDER1_REF=650573

 

 

CONDITIONS



1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

2

The development hereby permitted shall be carried out and retained strictly in accordance with the following approved plans: 01 and 05 Rev I.

 

3

Prior to preliminary ground works taking place, details of foul and surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details, and shall be provided on site prior to the first occupation and shall be retained for the lifetime of the development.

 

4

Prior to any above ground works, full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) shall be submitted to and approved in writing by the Local Planning Authority. All hard and soft landscape works shall be carried out in accordance with the approved details. The works shall be carried out prior to the occupation of the building or completion of the development, whichever is the sooner. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place, unless the Local Planning Authority gives its written consent to any variation.

 

5

Tree protection, methodology for construction adjacent to trees and Arb site supervision shall be undertaken in accordance with the submitted Tree Survey/ Arboricultural Method Statement and Tree protection shall be implemented as shown on Moore Partners 'Tree Protection Plan' drawing number MP/LOAK/01 dated 7th December unless the Local Planning Authority gives its prior written approval to any alterations.

 

6

If any tree, shrub or hedge shown to be retained in the submitted Arboricultural reports is removed, uprooted or destroyed, dies, or becomes severely damaged or diseased during development activities or within 3 years of the completion of the development, another tree, shrub or hedge of the same size and species shall be planted within 3 months at the same place, unless the Local Planning Authority gives its written consent to any variation. If within a period of five years from the date of planting any replacement tree, shrub or hedge is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree, shrub or hedge of the same species and size as that originally planted shall, within 3 months, be planted at the same place.

 

7

The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those specified in the submitted application form, unless otherwise agreed in writing by the Local Planning Authority.

 

8

Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

9

Prior to first occupation of the development hereby approved, 1 Electric Vehicle Charging Point shall be installed and retained thereafter for use by the occupants of the site.

 

10

Prior to first occupation of the development, the recommendations set out in the Preliminary Ecological Appraisal by T4 Ecology Ltd (dated December 2020) shall have been implemented and retained as such, unless otherwise agreed in writing with the LPA.

 

11

The proposed use of this site has been identified as being particularly vulnerable if land contamination is present, despite no specific former potentially contaminating uses having been identified for this site. Should any discoloured or odorous soils be encountered during development works or should any hazardous materials or significant quantities of non-soil forming materials be found, then all development works should be stopped, the local planning authority contacted and a scheme to investigate the risks and/or the adoption of any required remedial measures be submitted to, agreed and approved in writing by the local planning authority prior to the recommencement of development works. In such instances, following the completion of development works and prior to the first occupation of the site, sufficient information must be submitted to demonstrate that any required remedial measures were satisfactorily implemented or confirmation provided that no unexpected contamination was encountered.

 

 

12

Wheel washing or other cleaning facilities for vehicles leaving the site during construction works shall be installed and utilised to clean vehicles immediately before leaving the site. Any mud or other material deposited on nearby roads as a result of the development shall be removed.

 

13

No deliveries, external running of plant and equipment or demolition and construction works, other than internal works not audible outside the site boundary, shall take place on the site other than between the hours of 07:30 to 18:00 on Monday to Friday and 08:00 to 13:00 on Saturday and not at all on Sundays, Public or Bank Holidays without the prior written permission of the Local Planning Authority.

 

14

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any other order revoking and re-enacting that order) no development permitted by virtue of Classes A, AA, B, D & E of Part 1 to schedule 2 shall be undertaken.

 

15         

The development to which this planning permission relates shall not commence if any part of the development found lawful under EPF/1839/20 is already commenced.

 

16

All existing buildings shall be demolished and all materials resulting from the demolition shall be removed prior to first occupation of the proposed dwelling

 

17

 

The outbuilding approved under Lawful Development Certificate EPF/1839/20 shall not be implemented if this planning permission is implemented. If the outbuilding subject to EPF/1839/20 is erected before works commence on this planning application, it must be removed before the first residential occupation of the replacement dwelling hereby approved.

 

 