Agenda item

Planning Application - EPF/2705/19 Great Oak, Coopersale Street, Epping CM16 7PG

To consider the attached report for the demolition of two existing outbuildings and erection of separate dwelling and garage, proposed new entrance arrangement to improve site ingress and egress to improve highway safety. (Revised application to EPF/0503/19).

Minutes:

APPLICATION No:

EPF/2705/19

 

SITE ADDRESS:

Great Oak

Coopersale Street

Epping

CM16 7PG

 

PARISH:

Epping

 

WARD:

Epping Hemnall

 

 

DESCRIPTION OF PROPOSAL:

Demolition of two existing outbuildings & erection of separate dwelling & garage, proposed new entrance arrangement to improve site ingress & egress to improve highway safety. (Revised application to EPF/0503/19).

 

DECISION:

 Grant Permission (Subject to Legal Agreement)

 

Click on the link below to view related plans and documents for this case:

http://planpub.eppingforestdc.gov.uk/NIM.websearch/ExternalEntryPoint.aspx?SEARCH_TYPE=1&DOC_CLASS_CODE=PL&FOLDER1_REF=630278

 

CONDITIONS

 

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

2

The development hereby permitted shall be carried out and retained strictly in accordance with the following approved plans:

 

18066_SK001, 18066_SK002A, 18066_SK003, 18066_SK001, 18066_SK002A, 18066_SK003, 18066_SK004B, 18066_SK005B, Air raid shelter volume, Canteen Volume, Preliminary Ecological Appraisal including Extended Phase 1 Habitat Assessment, Bat Scoping Assessment, Great Crested newt HS1 Survey by Tim Moya Associates May 2019 190310-ED-01, Arboricultural Report by Tim Moya and Associates 190310-PD-11a dated  3/9/19, Bio and Geodiversity data by Essex Field Club ref: EFC3558, 24 Apr 2019, Planning Statement, Phase I Environmental Desk Study by Sequoia Environmental 3 April 2019 and Heritage Statement Revision A - 06-04-2020by Paul Saggers.

 

3

Prior to any above ground works, documentary and photographic details of the type and colours of the external finishes of the development have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

 

4

Prior to first occupation of the development herby permitted a plan indicating the position, design, materials and type of boundary treatment to be erected, shall have been submitted to an approved by the Local Planning Authority. The approved boundary treatment shall be implemented prior to the occupation of the development and thereafter permanently retained.

 

5

Prior to preliminary ground works taking place, details of foul and surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details, and shall be provided on site prior to the first occupation and shall be retained for the lifetime of the development.

 

6

If any tree, shrub or hedge shown to be retained in the submitted Arboricultural reports is removed, uprooted or destroyed, dies, or becomes severely damaged or diseased during development activities or within 3 years of the completion of the development, another tree, shrub or hedge of the same size and species shall be planted within 3 months at the same place, unless the Local Planning Authority gives its written consent to any variation. If within a period of five years from the date of planting any replacement tree, shrub or hedge is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree, shrub or hedge of the same species and size as that originally planted shall, within 3 months, be planted at the same place.

 

7

Prior to any above ground works, full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) shall be submitted to and approved in writing by the Local Planning Authority. All hard and soft landscape works shall be carried out in accordance with the approved details. The works shall be carried out prior to the occupation of the building or completion of the development, whichever is the sooner. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place, unless the Local Planning Authority gives its written consent to any variation.

 

8

No development, including works of demolition or site clearance, shall take place until a Tree Protection Plan, Arboricultural Method Statement and site monitoring schedule in accordance with BS:5837:2012 (Trees in relation to design, demolition and construction - Recommendations) has been submitted to the Local Planning Authority and approved in writing. The development shall be carried out only in accordance with the approved documents unless the Local Planning Authority gives its written consent to any variation.

 

9

Prior to any above groundworks, details and location of the parking spaces (including garages) equipped with active and/or passive Electric Vehicle Charging Point(s) shall have been submitted to and approved in writing with the Local Planning Authority (LPA), unless otherwise agreed in writing with the LPA. The installation of EVCP shall be completed in accordance with the approved details and made operational prior to first occupation. The details shall include: 

 

- Location of active and passive charging infrastructure; 

- Specification of charging equipment; and

- Operation/management strategy. The council will expect that a management plan for the charging points is set out clearly. This will address: 

a) Which parking bays will have active and/or passive charging provision, including disabled parking bays; 

b) How charging point usage will be charged amongst users; 

c) The process and the triggers for identifying when additional passive charging points will become activated; and

d) Electricity supply availability. The electricity supply should be already confirmed by the Network Provider so that the supply does not need to be upgraded at a later date. 

 

10

Prior to any above groundworks, a strategy to facilitate super-fast broadband for future occupants of the site shall have been submitted to and approved in writing by the Local Planning Authority (LPA). The strategy shall seek to ensure that upon occupation of a dwelling, either a landline or ducting to facilitate the provision of a broadband service to that dwelling from a site-wide network, is in place and provided as part of the initial highway works and in the construction of frontage thresholds to dwellings that abut the highway, unless evidence is put forward and agreed in writing by the LPA that technological advances for the provision of a broadband service for the majority of potential customers will no longer necessitate below ground infrastructure. The development of the site shall be carried out in accordance with the approved strategy unless otherwise agreed in writing by the LPA.

 

11

Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

12

All construction/demolition works and ancillary operations, including vehicle movement on site which are audible at the boundary of noise sensitive premises, shall only take place between the hours of 07.30 to 18.30 Monday to Friday and 08.00 to 13.00 hours on Saturday, and at no time during Sundays and Public/Bank Holidays unless otherwise agreed in writing by the Local Planning Authority.

 

13

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any other order revoking and re-enacting that order) no development permitted by virtue of Classes A, B and E of Part 1 to schedule 2 shall be undertaken, without the prior written agreement of the Local Planning Authority.

 

14

The proposed development shall be undertaken in accordance with the recommendations made in chapter 8 of the Preliminary Ecological Appraisal including Extended Phase 1 Habitat Assessment, Bat Scoping Assessment, Great Crested newt HS1 Survey by Tim Moya Associates May 2019 190310-ED-01.

 

15

Prior to the first occupation of the development the access arrangements, visibility splays, vehicle parking and turning areas as indicated on the approved plans shall be provided, hard surfaced, sealed and marked out. The access, parking and turning areas shall be retained in perpetuity for their intended purpose.

 

16

No development shall commence until an assessment of the risks posed by any contamination, carried out in accordance with British Standard BS 10175: Investigation of potentially contaminated sites - Code of Practice and the Environment Agency's Model Procedures for the Management of Land Contamination (CLR 11) (or equivalent British Standard and Model Procedures if replaced), shall have been submitted to and approved in writing by the local planning authority. If any contamination is found, a report specifying the measures to be taken, including the timescale, to remediate the site to render it suitable for the approved development shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures and timescale and a verification report shall be submitted to and approved in writing by the local planning authority. If, during the course of development, any contamination is found which has not been previously identified, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.

 

17

Following completion of the measures identified in the approved remediation scheme, and prior to the first use or occupation of the development, a verification report that demonstrates the effectiveness of the remediation carried out must be produced together with any necessary monitoring and maintenance programme and copies of any waste transfer notes relating to exported and imported soils shall be submitted to the Local Planning Authority for approval. The approved monitoring and maintenance programme shall be implemented. 

 

18

In the event that any evidence of potential contamination is found at any time when carrying out the approved development that was not previously identified in the Phase 2 report, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.

 

19

No preliminary groundworks of any kind shall take place until the applicant has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation which has been submitted to and approved in writing by the local planning authority.

 

20

Prior to the first occupation of the dwelling hereby approved the air raid shelter and canteen building shall be demolished and all debris removed from the site.

 

Supporting documents: