Agenda item

Planning Application - EPF/0826/22 - 71 Deepdene Road, Loughton

To consider the attached report for demolition of existing pre-fab house and replacement of a new dwelling house.

 

Minutes:

Application Ref:

EPF/0826/22

Application Type:

Full planning permission

 

 

Case Officer:

Kie Farrell

Site Address:

71 Deepdene Road

Loughton

IG10 3PH

Proposal:

Demolition of existing pre-fab house and replacement of a new dwelling house.

Ward:

Loughton Alderton

Parish:

Loughton

View Plans:

https://eppingforestdcpr.force.com/pr/s/planning-application/a0h8d000000Nyzr

Decision:

Approve with Conditions

 

 

Conditions: 13

 

 

1

 

The development hereby permitted shall begin not later than three years from the date of this decision.

Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).

 

 

2

 

The development hereby permitted shall be carried out and retained strictly in accordance with the following approved plans:

 

Drawing 1597/00 – Site Location Plan

Drawing 1597/01 – Block Plan as Existing and Proposed

Drawing 1597/02 – Floor Plans as Existing

Drawing 1597/03 – Elevations and Sections as Existing

Drawing 1597/04 – Floor Plans as Proposed

Drawing 1597/05 – Elevations and Sections as Proposed

Drawing 1597/06 – Street Elevation as Existing and Proposed

Drawing 1597/07 – Site Plan as Existing and Proposed

 

Reason: For the avoidance of doubt and to ensure the proposal is built in accordance with the approved plans.

 

 

3

 

The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those specified on the approved plans and documents, or those specified in the submitted application form.

 

Reason: To ensure a satisfactory appearance in the interests of visual amenity of the area, in accordance with policy DBE10 of the adopted Local Plan 1998 & 2006, and Policy DM9 of the Local Plan Submission Version 2017, and the NPPF.

 

 

4

 

No deliveries, external running of plant and equipment or demolition and construction works, other than internal works not audible outside the site boundary, shall take place on the site other than between the hours of 07:30 to 18:00 on Monday to Friday and 08:00 to 13:00 on Saturday and not at all on Sundays, Public or Bank Holidays.

 

Reason: To ensure that the proposed construction work does not cause undue nuisance and disturbance to neighbouring properties at unreasonable hours and in accordance with policies RP5A and DBE9 of the adopted Local Plan 1998 & 2006, and policies DM9 and DM 21 of the Local Plan Submission Version 2017, and the NPPF.

 

 

5

 

Wheel washing or other cleaning facilities for vehicles leaving the site during construction works shall be installed and utilised to clean vehicles immediately before leaving the site. Any mud or other material deposited on nearby roads as a result of the development shall be removed.

 

Reason: To avoid the deposit of material on the public highway in the interests of highway safety, in accordance with policy ST4 of the adopted Local Plan and Alterations 1998 & 2006, policy T1 of the Local Plan Submission Version 2017, and the NPPF.

 

 

6

 

Access to the flat roof hereby approved shall be for maintenance or emergency purposes only and the flat roof shall not be used as a seating area, roof garden, terrace, patio or similar amenity area.

 

Reason: To safeguard the privacy of adjacent properties, in accordance with policy DBE9 of the adopted Local Plan and Alterations 1998 & 2006, policy DM9 of the Local Plan Submission Version 2017, and the NPPF.

 

 

7

 

Prior to first occupation of the building hereby permitted the window in the flank elevation at first floor level facing No. 73 shall have been fitted with obscure glass with a minimum privacy level 3 obscurity, and no part of that window that is less than 1.7 metres above the internal floor level of the room in which it is installed shall be capable of being opened. Once installed the obscure glass shall be retained thereafter.

 

Reason: To prevent overlooking and loss of privacy to the occupants of neighbouring properties, in accordance with policy DBE9 of the adopted Local Plan and Alterations 1998 & 2006, policy DM 9 of the Local Plan Submission Version 2017, and the NPPF.

 

 

8

 

Prior to any above groundworks, a strategy to facilitate super-fast broadband for future occupants of the site shall have been submitted to and approved in writing by the Local Planning Authority (LPA). The strategy shall seek to ensure that upon occupation of a dwelling, either a landline or ducting to facilitate the provision of a broadband service to that dwelling from a site-wide network, is in place and provided as part of the initial highway works and in the construction of frontage thresholds to dwellings that abut the highway, unless evidence is put forward and agreed in writing by the LPA that technological advances for the provision of a broadband service for the majority of potential customers will no longer necessitate below ground infrastructure. The development of the site shall be carried out in accordance with the approved strategy.

 

Reason: To ensure the development contributes to supporting improved digital connectivity throughout the district and supports the wider aims and objectives for reducing car-led air pollution, improving the health and wellbeing of residents and visitors including the EFSAC, in accordance with policy CP1 of the adopted Local Plan 1998 & 2006, Policies D5, DM2, DM9, DM10 & DM22 of the Local Plan Submission Version 2017, and the NPPF.

 

 

9

 

Prior to preliminary ground works taking place, details of surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details and shall be provided on site prior to the first occupation and shall be retained for the lifetime of the development.

 

Reason: To ensure satisfactory provision and disposal of surface water in the interests of Land Drainage, in accordance with policy RP3 of the adopted Local Plan and Alterations 1998 & 2006, policies DM16 and DM18 of the Local Plan Submission Version 2017, and the NPPF.

 

 

10

 

Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

Reason: The District is classed as being in an area of severe water stress and the reduction of water use is therefore required in the interests of sustainability and in accordance with policy CP2 of the adopted Local Plan and Alterations 1998 & 2006, policy DM19 of the Local Plan Submission Version 2017, and the NPPF.

 

 

11

 

A) No work on any phase of the development (with the exception of demolition works where this is for the reason of making areas of the site available for site investigation), shall commence until an assessment of the risks posed by any contamination within that phase shall have been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a suitably qualified contaminated land practitioner, in accordance with British Standard BS 10175: Investigation of Potentially Contaminated Sites - Code of Practice and the Environment Agency's Guidelines for the Land Contamination: Risk Management (LCRM 2020) (or equivalent if replaced), and shall assess any contamination on the site, whether or not it originates on the site. The development shall only be carried out in accordance with the approved details unless the Local Planning Authority gives its written consent to any variation. The assessment shall include: (1) A survey of the extent, scale and nature of contamination and (2) An assessment of the potential risks to: human health; property (existing or proposed) including buildings, crops, livestock, pets, woodland, service lines and pipes; adjoining land; groundwater and surface waters; ecological systems; and archaeological sites and ancient monuments.

 

B) If following the risk assessment unacceptable risks are identified from land affected by contamination in that phase, no work on any phase of the development shall take place, until a detailed land remediation scheme has been completed. The scheme will be submitted to and approved in writing by the local planning authority. The scheme shall include an appraisal of remediation options, identification of the preferred option(s), the proposed remediation objectives and remediation criteria, and a description and programme of the works to be undertaken including the verification plan. (The remediation scheme shall be sufficiently detailed and thorough to ensure that after remediation, as a minimum, land should not be capable of being determined as contaminated land under Part IIA of the Environmental Protection Act 1990). The development shall only be carried out in accordance with the approved scheme. Following the completion of the remediation works and prior to the first occupation of the development, a verification report by a suitably qualified contaminated land practitioner shall be submitted to and approved in writing by the local planning authority.

 

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with policy RP4 of the adopted Local Plan 1998 & 2006, and policy DM21 of the Local Plan Submission Version 2017, and the NPPF.

 

 

12

 

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any other order revoking and re-enacting that order) no development permitted by virtue of Classes A, B, C, D, E and F of Part 1 to Schedule 2 shall be undertaken, without the prior written agreement of the Local Planning Authority.

 

Reason: The ensure further consideration is given with regards to the effect on the character and appearance of the area and living conditions on adjoining properties, in accordance with policy DBE9 of the adopted Local Plan 1998 & 2006, Policy DM9of the Local Plan Submission Version 2017, and the NPPF 2021.

 

 

13

 

The photovoltaic panels as shown on drawing number 1597/05 shall be installed prior to first occupation of the development hereby approved and then retained in perpetuity. Reason: in the interests of promoting sustainable and renewable energy in accordance with policy DM 20 of the Epping Forest Local Plan (Submission version) 2019 and with the objectives of the NPPF.

 

 

 

 

Informatives: (1)

 

14

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.

 