Agenda item

Planning Application EPF/2472/20 - 91 Queens Road, Buckhurst Hill IG9 5BW

(Service Manager – Development Management) To consider the attached report for the proposed demolition of the existing dwelling and the construction of a semi-detached pair of dwellings.

Minutes:

The Planning Officer, C Ahmet, presented a report for the proposed demolition of the existing dwelling and the construction of a semi-detached pair of dwellings. On 6 July 2022, Area Planning Sub-Committee South had deferred this item to the Committee with a recommendation to refuse the application as the existing building was a Non-Designated Heritage Asset (NDHA) and for the harm the development would cause to the Epping Forest Special Area of Conservation (EFSAC).

 

C Ahmet reported that the site was situated midway along the north side of Queens Road, and the existing dwelling was an extended, detached two-storey house. The road had a mixed character with a considerable variety of architectural styles. The application site was not within a conservation area, and nor was it protected by a statutory or locally listed status. It was understood that eminent Engineer Vernon AM Robertson had lived at the property in 1923.

 

The Committee noted the summary of representations received for this application, including five objections from neighbouring properties and concerns raised by the Parish Council. The Committee heard from an objector and the applicant’s agent before proceeding to debate the application.

 

A number of Councillors felt that there was no real heritage value in the existing building, or that any heritage value could be recorded as a photographic record prior to demolition. In addition, the design of the replacement semidetached dwellings was elegant, and a ‘blue plaque’ could be erected to record that the Engineer had lived there. However, some Councillors objected to the application as the existing dwelling was the oldest building in Queens Road which was worth preserving, and did not agree with the view of the Council’s Conservation Officer within the report.

 

The recommendation of Area Planning Sub-Committee South to refuse the application was lost. A motion was proposed by Cllr K Williamson, and seconded by Cllr S Patel, to grant planning permission subject to the Section 106 legal agreement and planning conditions contained within the original report considered by Area Planning Sub-Committee South.

 

Decision:

 

(1)        That planning application EPF/2472/20 for 91 Queens Road in Buckhurst Hill be granted planning permission, subject to:

 

(a)        the completion of a Section 106 legal agreement under the Town and Country Planning Act 1990 to pay financial contributions towards the mitigation of air pollution and increased recreational pressure for the Epping Forest Special Area of Conservation; and

 

(b)        the following planning conditions:

 

1…The development hereby permitted shall begin not later than three years from the date of this decision.

 

2…The development hereby permitted shall be carried out and retained strictly in accordance with the following approved plans: 110K; 111H; 112C and113C.

 

3…Prior to any above ground works, documentary and photographic details of the type and colours of the external finishes of the development have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

 

4…Prior to any above groundworks, a strategy to facilitate super-fast broadband for future occupants of the site shall have been submitted to and approved in writing by the Local Planning Authority (LPA). The strategy shall seek to ensure that upon occupation of a dwelling, either a landline or ducting to facilitate the provision of a broadband service to that dwelling from a site-wide network, is in place and provided as part of the initial highway works and in the construction of frontage thresholds to dwellings that abut the highway, unless evidence is put forward and agreed in writing by the LPA that technological advances for the provision of a broadband service for the majority of potential customers will no longer necessitate below ground infrastructure. The development of the site shall be carried out in accordance with the approved strategy.

 

5…Prior to first occupation of the building/extension hereby permitted the window(s) in the flank elevation(s) at first floor level and above, shall have been fitted with obscure glass with a minimum privacy level 3 obscurity, and no part of that/those window[s] that is less than 1.7 metres above the internal floor level of the room in which it is installed shall be capable of being opened. Once installed the obscure glass shall be retained thereafter.

 

6A…No work on any phase of the development (with the exception of demolition works where this is for the reason of making areas of the site available for site investigation), shall commence until an assessment of the risks posed by any contamination within that phase shall have been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a suitably qualified contaminated land practitioner, in accordance with British Standard BS 10175: Investigation of Potentially Contaminated Sites - Code of Practice and the Environment Agency's Guidelines for the Land Contamination: Risk Management (LCRM 2020) (or equivalent if replaced), and shall assess any contamination on the site, whether or not it originates on the site. The development shall only be carried out in accordance with the approved details unless the Local Planning Authority gives its written consent to any variation. The assessment shall include: (1) A survey of the extent, scale and nature of contamination and (2) An assessment of the potential risks to: human health; property (existing or proposed) including buildings, crops, livestock, pets, woodland, service lines and pipes; adjoining land; groundwater and surface waters; ecological systems; and archaeological sites and ancient monuments.

 

6B… If following the risk assessment unacceptable risks are identified from land affected by contamination in that phase, no work on any phase of the development shall take place, until a detailed land remediation scheme has been completed. The scheme will be submitted to and approved in writing by the local planning authority. The scheme shall include an appraisal of remediation options, identification of the preferred option(s), the proposed remediation objectives and remediation criteria, and a description and programme of the works to be undertaken including the verification plan. (The remediation scheme shall be sufficiently detailed and thorough to ensure that after remediation, as a minimum, land should not be capable of being determined as contaminated land under Part IIA of the Environmental Protection Act 1990). The development shall only be carried out in accordance with the approved scheme. Following the completion of the remediation works and prior to the first occupation of the development, a verification report by a suitably qualified contaminated land practitioner shall be submitted to and approved in writing by the local planning authority.

 

7…Prior to preliminary ground works taking place, details of surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details and shall be provided on site prior to the first occupation and shall be retained for the lifetime of the development.

 

8… Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

9… No deliveries, external running of plant and equipment or demolition and construction works, other than internal works not audible outside the site boundary, shall take place on the site other than between the hours of 07:30 to 18:00 on Monday to Friday and 08:00 to 13:00 on Saturday and not at all on Sundays, Public or Bank Holidays.

 

10… Wheel washing or other cleaning facilities for vehicles leaving the site during construction works shall be installed and utilised to clean vehicles immediately before leaving the site. Any mud or other material deposited on nearby roads as a result of the development shall be removed.

 

11… If any tree, shrub or hedge shown to be retained in the submitted Arboricultural reports is removed, uprooted or destroyed, dies, or becomes severely damaged or diseased during development activities or within 3 years of the completion of the development, another tree, shrub or hedge of the same size and species shall be planted within 3 months at the same place. If within a period of five years from the date of planting any replacement tree, shrub or hedge is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree, shrub or hedge of the same species and size as that originally planted shall, within 3 months, be planted at the same place.

 

12…Prior to any above ground works, full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) shall be submitted to and approved in writing by the Local Planning Authority. All hard and soft landscape works shall be carried out in accordance with the approved details. The works shall be carried out prior to the occupation of the building or completion of the development, whichever is the sooner. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place.

 

13…No development, including works of demolition or site clearance, shall take place until a Tree Protection Plan, Arboricultural Method Statement and site monitoring schedule in accordance with BS:5837:2012 (Trees in relation to design, demolition and construction - Recommendations) has been submitted to the Local Planning Authority and approved in writing. The development shall be carried out only in accordance with the approved documents.

 

14… Prior to any above groundworks, details and location of the parking spaces (including garages) equipped with active Electric Vehicle Charging Point(s) shall have been submitted to and approved in writing with the Local Planning Authority (LPA), unless otherwise agreed in writing with the LPA. The installation of EVCP shall be completed in accordance with the approved details and made operational prior to first occupation. The details must include details as follows:

 

- Location of active charging infrastructure; and

- Specification of charging equipment to be used.

 

15…The redundant vehicle dropped kerb crossover shall be fully reinstated with full footway construction and full height kerbing.

 

16…Prior to the first occupation of the development, the Developer shall be responsible for the provision, implementation and distribution of a Residential Travel information Pack for sustainable transport, approved by Essex County Council, to include six one day travel vouchers for use with the relevant local public transport operator. These packs (including tickets) are to be provided by the Developer to each dwelling free of charge.

 

17…The proposed use of this site has been identified as being particularly vulnerable if land contamination is present, despite no specific former potentially contaminating uses having been identified for this site. Should any discoloured or odorous soils be encountered during development works or should any hazardous materials or significant quantities of non-soil forming materials be found, then all development works should be stopped and an assessment of the risks posed by any contamination, carried out in accordance with British Standard BS 10175: Investigation of potentially contaminated sites - Code of Practice and the Environment Agency's Model Procedures for the Management of Land Contamination (CLR 11) (or equivalent British Standard and Model Procedures if replaced) shall be undertaken. If any contamination is found then the site shall be remediated. The remediation scheme shall be sufficiently detailed and thorough to ensure that upon completion the site will not qualify as contaminated land under Part IIA of the Environmental Protection Act 1990 in relation to its intended use.