Agenda item

Planning Application - EPF/3050/21 4 Kendal Avenue, Epping CM16 4PN

To consider the attached report on the demolition of existing dwelling and construction of a new dwelling.

Minutes:

Application Ref:

EPF/3050/21

Application Type:

Full planning permission

Case Officer:

Caroline Brown

Site Address:

4 Kendal Avenue

Epping

CM16 4PN

Proposal:

Demolition of existing dwelling and construction of a new dwelling.

Ward:

Epping Hemnall

Parish:

Epping

View Plans:

https://eppingforestdcpr.force.com/pr/s/planning-application/a0h8d000000NxJo

Decision:

Approve with Conditions

 

Conditions: (16)

 

1

 

The development hereby permitted shall begin not later than three years from the date of this decision.


Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).

 

2

 

The development hereby permitted shall be carried out and retained strictly in accordance with the following approved plans: 2612 - 01; 02; 03; 04B; 05 B

 

Reason: For the avoidance of doubt and to ensure the proposal is built in accordance with the approved plans.

 

3

 

Prior to first occupation of the building/extension hereby permitted the window(s) in the flank elevation(s) at first floor level and above, shall have been fitted with obscure glass with a minimum privacy level 3 obscurity, and no part of that/those window[s] that is less than 1.7 metres above the internal floor level of the room in which it is installed shall be capable of being opened. Once installed the obscure glass shall be retained thereafter.

 

Reason: To prevent overlooking and loss of privacy to the occupants of neighbouring properties, in accordance with policy DBE9 of the adopted Local Plan and Alterations 1998 & 2006, policy DM 9 of the Local Plan Submission Version 2017, and the NPPF.

 

4

 

Prior to preliminary ground works taking place, details of surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details and shall be provided on site prior to the first occupation and shall be retained for the lifetime of the development.

 

Reason: To ensure satisfactory provision and disposal of surface water in the interests of Land Drainage, in accordance with policy RP3 of the adopted Local Plan and Alterations 1998 & 2006, policies DM16 and DM18 of the Local Plan Submission Version 2017, and the NPPF.

 

5

 

Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

Reason: The District is classed as being in an area of severe water stress and the reduction of water use is therefore required in the interests of sustainability and in accordance with policy CP2 of the adopted Local Plan and Alterations 1998 & 2006, policy DM19 of the Local Plan Submission Version 2017, and the NPPF.

 

6

 

Prior to first occupation of the development hereby approved, 1 Electric Vehicle Charging Point shall be installed and retained thereafter for use by the occupants of the site.

 

Reason: To help support improvements to air quality in accordance with policies T1 and DM22 of the Local Plan Submission Version 2017, and the NPPF.

 

7

 

Wheel washing or other cleaning facilities for vehicles leaving the site during construction works shall be installed and utilised to clean vehicles immediately before leaving the site. Any mud or other material deposited on nearby roads as a result of the development shall be removed.

 

Reason: To avoid the deposit of material on the public highway in the interests of highway safety, in accordance with policy ST4 of the adopted Local Plan and Alterations 1998 & 2006, policy T1 of the Local Plan Submission Version 2017, and the NPPF.

 

8

 

Prior to the first occupation of the development the existing access of Hartland Road shall be permanently closed off incorporating the reinstatement of the footway and kerbing to full height.

 

Reason: To ensure the removal of and to preclude the creation of unnecessary points of traffic conflict in the highway in the interests of highway safety.

 

9

 

Access to the flat roof over the extension hereby approved shall be for maintenance or emergency purposes only and the flat roof shall not be used as a seating area, roof garden, terrace, patio or similar amenity area.

 

Reason: To safeguard the privacy of adjacent properties, in accordance with policy DBE9 of the adopted Local Plan and Alterations 1998 & 2006, policy DM9 of the Local Plan Submission Version 2017, and the NPPF.

 

10

 

Prior to any above ground works, documentary and photographic details of the type and colours of the external finishes of the development have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

 

Reason: To ensure a satisfactory appearance in the interests of visual amenity, in accordance with policy DBE1 of the adopted Local Plan and Alterations 1998 & 2006, policy DM9 of the Local Plan Submission Version 2017, and the NPPF.

 

11

 

If any tree, shrub or hedge shown to be retained in the submitted Arboricultural reports is removed, uprooted or destroyed, dies, or becomes severely damaged or diseased during development activities or within 3 years of the completion of the development, another tree, shrub or hedge of the same size and species shall be planted within 3 months at the same place. If within a period of five years from the date of planting any replacement tree, shrub or hedge is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree, shrub or hedge of the same species and size as that originally planted shall, within 3 months, be planted at the same place.

 

Reason: To comply with the duties indicated in Section 197 of the Town and Country Planning Act 1990 as well as to safeguard the amenity of the existing trees, shrubs or hedges and to ensure a satisfactory appearance to the development, in accordance with policies LL10 and LL11 of the adopted Local Plan and Alterations 1998 & 2006, and policies DM3 and DM5 of the Local Plan Submission Version 2017, and the NPPF.

 

12

 

Prior to any above ground works, full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) shall be submitted to and approved in writing by the Local Planning Authority. All hard and soft landscape works shall be carried out in accordance with the approved details. The works shall be carried out prior to the occupation of the building or completion of the development, whichever is the sooner. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted, or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place.

 

Reason: To comply with the duties indicated in Section 197 of the Town and Country Planning Act 1990 so as to ensure that the details of the development of the landscaping are complementary, and to ensure a satisfactory appearance to the development, in accordance with policies CP2 and LL11 of the adopted Local Plan and Alterations 1998 & 2006, policies DM3 and DM5 of the Local Plan Submission Version 2017, and the NPPF.

 

13

 

Tree protection shall be installed as shown on Moore Partners 'Tree Protection Plan' drawing number MP/4KA/02 (dated 3rd December 2021) prior to the commencement of development activities (including any demolition). The methodology for development (including Arboricultural supervision) shall be undertaken in accordance with the submitted Tree Survey/ Arboricultural Method Statement reports.

 

Reason: To comply with the duties indicated in Section 197 of the Town and Country Planning Act 1990, and to enable full and proper consideration be given to the impact of the proposed development on existing trees / hedges, so as to safeguard and enhance the visual amenities of the area and to ensure a satisfactory appearance to the development in accordance with policy LL10 of the adopted Local Plan 1998 & 2006, policies DM3 and DM5 of the Local Plan Submission Version 2017, and the NPPF 2021.

 

 

14

 

Prior to any above ground works, documentary and photographic details of the type and colours of the external finishes of the development have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

 

Reason: To ensure a satisfactory appearance in the interests of visual amenity, in accordance with policy DBE1 [+ DBE4 when located in the Green Belt] of the adopted Local Plan and Alterations 1998 & 2006, policy DM9 of the Local Plan Submission Version 2017, and the NPPF.

 

15

 

No deliveries, external running of plant and equipment or demolition and construction works, other than internal works not audible outside the site boundary, shall take place on the site other than between the hours of 07:30 to 18:00 on Monday to Friday and 08:00 to 13:00 on Saturday and not at all on Sundays, Public or Bank Holidays.

 

Reason: To ensure that the proposed construction work does not cause undue nuisance and disturbance to neighbouring properties at unreasonable hours and in accordance with policies RP5A and DBE9 of the adopted Local Plan 1998 & 2006, and policies DM9 and DM 21 of the Local Plan Submission Version 2017, and the NPPF.

 

16       

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any other order revoking and re-enacting that order) no development permitted by virtue of Classes A, B, E and F of Part 1 to schedule 2 shall be undertaken, without the prior written agreement of the Local Planning Authority.

 

Reason: The ensure further consideration is given with regards to the effect on the character and appearance of the area and living conditions on adjoining properties, in accordance with policy DBE9 of the adopted Local Plan 1998 & 2006, Policy DM9 of the Local Plan Submission Version 2017, and the NPPF.

 

 

Informatives: (2)

 

17

 

 

 

 

18

 

All work within or affecting the highway is to be laid out and constructed by prior arrangement with, and to the requirements and satisfaction of, the Highway Authority, details to be agreed before the commencement of works. The applicants should be advised to contact the Development Management Team by email at development.management@essexhighways.org

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.

 

Supporting documents: