Agenda item

Planning Application - EPF/3291/21 The Gate House, Coopesale Common, Coopersale, Epping CM16 7QT

To consider the attached report on the demolition of the existing dwelling and extensive outbuildings and the erection of a new detached traditional brick-built house (replacement dwelling).

Minutes:

 

Application Ref:

EPF/3291/21

Application Type:

Full planning permission

Case Officer:

Caroline Brown

Site Address:

The Gate House

Coopersale Common

Coopersale

Epping

CM16 7QT

Proposal:

The demolition of the existing dwelling and extensive outbuildings and the erection of a new detached traditional brick-built house.

(replacement dwelling).

Ward:

Epping Hemnall

Parish:

Epping

View Plans:

https://eppingforestdcpr.force.com/pr/s/planning-application/a0h8d000000Nxh0

Decision:

Approve with Conditions

 

Conditions: (17)

 

1

 

No deliveries, external running of plant and equipment or demolition and construction works, other than internal works not audible outside the site boundary, shall take place on the site other than between the hours of 07:30 to 18:00 on Monday to Friday and 08:00 to 13:00 on Saturday and not at all on Sundays, Public or Bank Holidays.

 

Reason: To ensure that the proposed construction work does not cause undue nuisance and disturbance to neighbouring properties at unreasonable hours and in accordance with policies RP5A and DBE9 of the adopted Local Plan 1998 & 2006, and policies DM9 and DM 21 of the Local Plan Submission Version 2017, and the NPPF.

 

2

 

The development hereby permitted shall be carried out and retained strictly in accordance with the following approved plans: (02)001, (02)003, (02)005, (02)006, (02)007, (02)008, (02)009, (02)010, (02)013 Rev B, (02)014 Rev B, (02)015 Rev B, (02)016 Rev B, (02)017 Rev B, (02)018 Rev B, (02)019 Rev B, (02)021 Rev B, (02)025 Rev B

 

Reason: For the avoidance of doubt and to ensure the proposal is built in accordance with the approved plans.

 

3

 

The development hereby permitted shall begin not later than three years from the date of this decision.

Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).

 

4

 

Prior to first occupation of the building/extension hereby permitted the window(s) in the flank elevation(s) at first floor level and above, shall have been fitted with obscure glass with a minimum privacy level 3 obscurity, and no part of that/those window[s] that is less than 1.7 metres above the internal floor level of the room in which it is installed shall be capable of being opened. Once installed the obscure glass shall be retained thereafter.

 

Reason: To prevent overlooking and loss of privacy to the occupants of neighbouring properties, in accordance with policy DBE9 of the adopted Local Plan and Alterations 1998 & 2006, policy DM 9 of the Local Plan Submission Version 2017, and the NPPF.

 

5

 

Prior to preliminary ground works taking place, details of surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details and shall be provided on site prior to the first occupation and shall be retained for the lifetime of the development.

 

Reason: To ensure satisfactory provision and disposal of surface water in the interests of Land Drainage, in accordance with policy RP3 of the adopted Local Plan and Alterations 1998 & 2006, policies DM16 and DM18 of the Local Plan Submission Version 2017, and the NPPF.

 

6

 

Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

Reason: The District is classed as being in an area of severe water stress and the reduction of water use is therefore required in the interests of sustainability and in accordance with policy CP2 of the adopted Local Plan and Alterations 1998 & 2006, policy DM19 of the Local Plan Submission Version 2017, and the NPPF.

 

7

 

Prior to first occupation of the development hereby approved, 1 Electric Vehicle Charging Point shall be installed and retained thereafter for use by the occupants of the site.

 

Reason: To help support improvements to air quality in accordance with policies T1 and DM22 of the Local Plan Submission Version 2017, and the NPPF.

 

8

 

Wheel washing or other cleaning facilities for vehicles leaving the site during construction works shall be installed and utilised to clean vehicles immediately before leaving the site. Any mud or other material deposited on nearby roads as a result of the development shall be removed.

 

Reason: To avoid the deposit of material on the public highway in the interests of highway safety, in accordance with policy ST4 of the adopted Local Plan and Alterations 1998 & 2006, policy T1 of the Local Plan Submission Version 2017, and the NPPF.

 

9

 

No development shall commence until an assessment of the risks posed by any contamination, carried out in accordance with British Standard BS 10175: Investigation of potentially contaminated sites - Code of Practice and the Environment Agency’s Model Procedures for the Management of Land Contamination (CLR 11) (or equivalent British Standard and Model Procedures if replaced), shall have been submitted to and approved in writing by the local planning authority. If any contamination is found, a report specifying the measures to be taken, including the timescale, to remediate the site to render it suitable for the approved development shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures and timescale and a verification report shall be submitted to and approved in writing by the local planning authority. If, during the course of development, any contamination is found which has not been previously identified, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.

 

Reason:- To ensure the risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors, in accordance with the guidance contained within the National Planning Policy Framework, policy RP4 of the adopted Local Plan and Alterations, and policy DM 21 of the Epping Forest District Council Local Plan Submission Version 2017. 

 

10

 

If any tree, shrub or hedge shown to be retained in the submitted Arboricultural reports is removed, uprooted or destroyed, dies, or becomes severely damaged or diseased during development activities or within 3 years of the completion of the development, another tree, shrub or hedge of the same size and species shall be planted within 3 months at the same place. If within a period of five years from the date of planting any replacement tree, shrub or hedge is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree, shrub or hedge of the same species and size as that originally planted shall, within 3 months, be planted at the same place.

 

Reason: To comply with the duties indicated in Section 197 of the Town and Country Planning Act 1990 as well as to safeguard the amenity of the existing trees, shrubs or hedges and to ensure a satisfactory appearance to the development, in accordance with policies LL10 and LL11 of the adopted Local Plan and Alterations 1998 & 2006, and policies DM3 and DM5 of the Local Plan Submission Version 2017, and the NPPF.

 

11

 

No unbound material shall be used in the surface treatment of the vehicular access within 6 metres of the highway boundary.

 

Reason: To avoid displacement of loose material onto the highway in the interests of highway safety. 

 

12

 

Removal of excavated material Tree Protection Tree protection shall be installed as shown on the Writtle Forest Consultancy Ltd 'Arboricultural Method Statement & Tree Protection Plan Ref No: 220115' (drawing number ‘220115/01 Rev A’) dated 3rd February 2022. prior to the commencement of development activities (including any demolition). The methodology for development (including Arboricultural supervision) shall be undertaken in accordance with the submitted Tree Survey/ Arboricultural Method Statement reports.

Reason: To comply with the duties indicated in Section 197 of the Town and Country Planning Act 1990, and to enable full and proper consideration be given to the impact of the proposed development on existing trees / hedges, so as to safeguard and enhance the visual amenities of the area and to ensure a satisfactory appearance to the development in accordance with policy LL10 of the adopted Local Plan 1998 & 2006, policies DM3 and DM5 of the Local Plan Submission Version 2017, and the NPPF 2021.

 

13

 

No deliveries, external running of plant and equipment or demolition and construction works, other than internal works not audible outside the site boundary, shall take place on the site other than between the hours of 07:30 to 18:00 on Monday to Friday and 08:00 to 13:00 on Saturday and not at all on Sundays, Public or Bank Holidays.

 

Reason: To ensure that the proposed construction work does not cause undue nuisance and disturbance to neighbouring properties at unreasonable hours and in accordance with policies RP5A and DBE9 of the adopted Local Plan 1998 & 2006, and policies DM9 and DM 21 of the Local Plan Submission Version 2017, and the NPPF.

 

14

 

The garage hereby approved shall be kept available at all times for the parking of motor vehicles by the occupants of the dwelling(s) and their visitors along with incidental storage and for no other purposes.

 

Reason: It is essential that the garage be retained for the storage of a motor vehicle to satisfy the requirements of the Council's adopted vehicle parking standards, in accordance with policy ST6 of the adopted Local Plan and Alterations, Policy T1 of the Local Plan Submission Version 2017, and the NPPF.

 

15

 

Prior to any above ground works, documentary and photographic details of the type and colours of the external finishes of the development have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

 

Reason: To ensure a satisfactory appearance in the interests of visual amenity, in accordance with policy DBE1 of the adopted Local Plan and Alterations 1998 & 2006, policy DM9 of the Local Plan Submission Version 2017, and the NPPF

 

16

 

Access to the flat roof over the extension hereby approved shall be for maintenance or emergency purposes only and the flat roof shall not be used as a seating area, roof garden, terrace, patio or similar amenity area.

 

Reason: To safeguard the privacy of adjacent properties, in accordance with policy DBE9 of the adopted Local Plan and Alterations 1998 & 2006, policy DM9 of the Local Plan Submission Version 2017, and the NPPF.

 

17        

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any other order revoking and re-enacting that order) no development permitted by virtue of Classes A, B, E and F of Part 1 to schedule 2 shall be undertaken, without the prior written agreement of the Local Planning Authority.

 

Reason: The ensure further consideration is given with regards to the effect on the character and appearance of the area and living conditions on adjoining properties, in accordance with policy DBE9 of the adopted Local Plan 1998 & 2006, Policy DM9 of the Local Plan Submission Version 2017, and the NPPF.

 

 

 

Informatives: (3)

 

18

 

The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including planning policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.

 

19

 

All work within or affecting the highway is to be laid out and constructed by prior arrangement with, and to the requirements and satisfaction of, the Highway Authority, details to be agreed before the commencement of works. The applicants should be advised to contact the Development Management Team by email at development.management@essexhighways.org  

 

2 of 2

ii. The Public Right of Way network is protected by the Highways Act 1980. Any unauthorised interference with any route noted on the Definitive Map of PROW is considered to be a breach of this legislation. The public’s rights and ease of passage over public Footpath no.20 Epping, shall be maintained free and unobstructed at all times to ensure the continued safe passage of the public on the definitive right of way.

 

The grant of planning permission does not automatically allow development to commence. In the event of works affecting the highway, none shall be permitted to commence until such time as they have been fully agreed with this Authority. In the interests of highway user safety this may involve the applicant requesting a temporary closure of the definitive route using powers included in the aforementioned Act. All costs associated with this shall be borne by the applicant and any damage caused to the route shall be rectified by the applicant within the timescale of the closure.

 

 

 