Issue - meetings

Acceptance of Tender - Contract 390 - Planned Gas and Renewable Energy Heating Installations and Associate Electrical Upgrade Work 2019-24

Meeting: 06/01/2020 - Cabinet (Item 79)

79 Acceptance of Tender - Contract 390 - Planned Gas and Renewable Energy Heating Installations and Associate Electrical Upgrade Work 2019-24 pdf icon PDF 341 KB

To consider the attached report (C-025-2019-20).

 

 

Additional documents:

Decision:

(1)        That, Gracelands Complete Maintenance Services Ltd be awarded the 1-year contract renewable annually for up to a maximum of 4-further years, for the planned installation of gas and renewable energy heating and associated electrical upgrade work to Council-owned properties in the sum of £103,377.16 with an overall weighted price and quality score of 97.1%;

 

(2)        That Complete Building Services Herts Ltd be selected as the Council’s Reserve Tenderer and that, should it not be possible to enter into contract with  Gracelands Complete Maintenance Services Ltd for some reason, Complete Building Services Herts Ltd be awarded the 1-year contract renewable annually for up to a maximum of 4-further years, for the planned installation of gas and renewable energy heating and associated electrical upgrade work to Council-owned properties, being the second most economically advantageous tender received, with a Tender Sum of £187,311.93 with an overall weighted price and quality score of 64.4%;

 

(3)        That, the overall value of the works be capped to the allocated budgets included in the Capital Programme identified for Gas and Electrical Heating replacements on an annual basis; and

 

(4)        That, this contract be designated as a serial contract to facilitate the annual adjustment to the tendered rates in accordance with the Royal Institution of Chartered Surveyors (RICS) BCIS ALLCOS Resource Cost Index of All Construction: All Repair and Maintenance Work #7419.  

 

Minutes:

The Housing and Property Services Portfolio Holder, Councillor H Whitbread introduced the report on the acceptance of tender for contract 390.

 

In order to undertake Planned Gas and Renewable Energy Heating Installations and Associated Electrical Upgrade Work to Council-owned properties during the financial year 2019-20 and over the following 4-year period, it was necessary to undertake a procurement exercise based on the Most Economically Advantageous Tender (MEAT) taking cost and quality into account and to satisfy the requirements of the Council’s Procurement Rules. 

 

 

DECISION:

 

(1)        That, Gracelands Complete Maintenance Services Ltd be awarded the 1-year contract renewable annually for up to a maximum of 4-further years, for the planned installation of gas and renewable energy heating and associated electrical upgrade work to Council-owned properties in the sum of £103,377.16 with an overall weighted price and quality score of 97.1%;

 

(2)        That Complete Building Services Herts Ltd be selected as the Council’s Reserve Tenderer and that, should it not be possible to enter into contract with  Gracelands Complete Maintenance Services Ltd for some reason, Complete Building Services Herts Ltd be awarded the 1-year contract renewable annually for up to a maximum of 4-further years, for the planned installation of gas and renewable energy heating and associated electrical upgrade work to Council-owned properties, being the second most economically advantageous tender received, with a Tender Sum of £187,311.93 with an overall weighted price and quality score of 64.4%;

 

(3)        That, the overall value of the works be capped to the allocated budgets included in the Capital Programme identified for Gas and Electrical Heating replacements on an annual basis; and

 

(4)        That, this contract be designated as a serial contract to facilitate the annual adjustment to the tendered rates in accordance with the Royal Institution of Chartered Surveyors (RICS) BCIS ALLCOS Resource Cost Index of All Construction: All Repair and Maintenance Work #7419.  

 

 

Reasons for Proposed Decision:

 

The existing gas and electric heating installations installed in some Council-owned properties were in a poor condition and in need of replacement.  Under the Decent Homes Standard gas and electric central heating are listed as “Key Building Components” and it is recognised that further deterioration could have an immediate impact on the integrity of the building and cause further deterioration in other building components. If gas and electric central heating boilers and components deteriorate further, they have the potential to cause adverse health and safety implications.  

 

Gas and electric heating installations were major programmes of work within the Housing Capital Works Programme, with gas and electric heating installations and upgrades carried out on a planned programme of work and on an ad-hoc basis.

 

(a)  Planned gas heating installations require a programmed approach which was undertaken by the contactor and generally required a designated Site Supervisor to oversee the project and manage the planning of the works along with a Resident Liaison Officer (RLO) who will manage Council tenants’ expectations, with both roles provided by the contractor. Planned works generally consisted of a full gas central heating system  ...  view the full minutes text for item 79