Agenda item

PLANNING APPLICATION EPF/2577/11 - ERECTION OF A TWO STOREY DETACHED DWELLING AND COMMUNITY NATURE RESERVE - SPARKS FARM, 185 NINE ASHES ROAD, HIGH ONGAR

(Director of Planning and Economic Development) To consider the attached report.

Minutes:

The Planning Officer reported that this application had been considered by Area Plans Sub-Committee East at their meeting on 29 August 2012.  Members of the Sub-Committee, whilst sympathetic to the scheme, had expressed concern about a Section 106 Agreement being able to ensure the retention of a publicly accessible nature reserve in the long term.  The Sub-Committee had, therefore, referred the application to this Committee with a recommendation that planning permission be granted subject to conditions and to consideration being given to the validity and enforceability of a planning obligation and its suitability as a mechanism to secure long term benefits.

 

The Committee noted that there had been insufficient time to present a unilateral undertaking to this meeting.  Members considered a statement made by the applicant's agent and noted that the Council’s Solicitor had advised that a suitably worded Section 106 Agreement would be valid and enforceable as a mechanism to secure long term benefits in this case.

 

The Committee considered the proposed development had an acceptable appearance, would cause no harm to the interests of amenity and would be no less sustainable than any other modern house constructed within the built-up enclave of Nine Ashes.  Members concluded that whilst being inappropriate development in the Green Belt, the significance of the improvement in the openness that would arise from the proposal together with the nature conservation and landscaped benefits offered would be great.  The Committee also considered that the benefits to the interests of nature conservation could only be secured in connection with this proposal since the proposed nature reserve was entirely within land in the applicant’s ownership and could not be secured anywhere else.

 

            RESOLVED:

 

That, subject to the completion, within six months of the date of this meeting, of an agreement under Section 106 of the Town and Country Planning Act 1990 in respect of the formation of a Community Nature Reserve accessible by members of the public in perpetuity and maintained by the owners of the proposed house in accordance with the approved 10 year Nature Conservation Management Plan and with an obligation for further agreed Management Plans to be in place thereafter for the future management of this community Nature Reserve, planning application EPF/2577/11 be granted subject to the following conditions:

 

1

The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this notice.

 

2

The development hereby permitted will be completed strictly in accordance with the approved drawings nos: 1268 01A, 1268 04B and 956/03, 956/04, 956/05, 956/06, 956/07, 956/08, 956/09, 956/10 and 956/11.

 

3

The development hereby approved shall not be commenced until a detailed methodology for amphibian and reptile mitigation including capture effort and removal together with a relevant plan in respect of the application site and adjoining land in the applicant’s ownership as indicated on drawing number 1268 01A have been submitted to and approved in writing by the Local Planning Authority.  The development shall be carried out in accordance with the approved methodology.

 

4

The development hereby approved shall not be commenced until a detailed description of "appropriate measures" that should be adopted if bats are found in trees, as referred to in section 6.8 of the ecological survey included with the application, have been submitted to and approved in writing by the Local Planning Authority in respect of the application site and adjoining land in the applicants ownership as indicated on drawing number 1268 01A .  The development shall be carried out in accordance with the approved measures.

 

5

No development, including works of demolition or site clearance, shall take place until a Tree Protection Plan, Arboricultural Method Statement and site monitoring schedule in accordance with BS 5837:2012 (Trees in relation to design, demolition and construction - Recommendations) has been submitted to the Local Planning Authority and approved in writing. The development shall be carried out only in accordance with the approved documents unless the Local Planning Authority gives its written consent to any variation.

 

6

No development, including site clearance, shall take place until a scheme of soft landscaping and a statement of the methods, including a timetable, for its Implementation (linked to the development schedule) in respect of the application site and adjoining land in the applicants ownership as indicated on drawing number 1268 01A, have been submitted to the Local Planning Authority and approved in writing. The landscape scheme shall be carried out in accordance with the approved details and the agreed timetable. If any plant dies, becomes diseased or fails to thrive within a period of 5 years from the date of planting, or is removed, uprooted or destroyed, it must be replaced by another plant of the same kind and size and at the same place, unless the Local Planning Authority agrees to a variation beforehand in writing.

 

7

A Landscape Management Plan, including long term design objectives, management responsibilities and maintenance schedules for all landscape areas within the application site and adjoining land in the applicants ownership as indicated on drawing number 1268 01A shall be submitted to and approved by the Local Planning Authority prior to the commencement of the development. The landscape management plan shall be carried out as approved.

 

8

No development shall take place until a Phase 1 Land Contamination investigation has been carried out. A protocol for the investigation shall be submitted to and approved in writing by the Local Planning Authority before commencement of the Phase 1 investigation. The completed Phase 1 report shall be submitted to and approved by the Local Planning Authority prior to the commencement of any necessary Phase 2 investigation. The report shall assess potential risks to present and proposed humans, property including buildings, crops, livestock, pets, woodland and service lines and pipes, adjoining land, groundwaters and surface waters, ecological systems, archaeological sites and ancient monuments and the investigation must be conducted in accordance with DEFRA and the Environment Agency's "Model Procedures for the Management of Land Contamination, CLR 11", or any subsequent version or additional regulatory guidance.

[Note: This condition must be formally discharged by the Local Planning Authority before the submission of details pursuant to the Phase 2 site investigation condition that follows]

 

9

Should the Phase 1 Land Contamination preliminary risk assessment carried out under the above condition identify the presence of potentially unacceptable risks, no development shall take place until a Phase 2 site investigation has been carried out. A protocol for the investigation shall be submitted to and approved by the Local Planning Authority before commencement of the Phase 2 investigation. The completed Phase 2 investigation report, together with any necessary outline remediation options, shall be submitted to and approved by the Local Planning Authority prior to any redevelopment or remediation works being carried out. The report shall assess potential risks to present and proposed humans, property including buildings, crops, livestock, pets, woodland and service lines and pipes, adjoining land, groundwaters and surface waters, ecological systems, archaeological sites and ancient monuments and the investigation must be conducted in accordance with DEFRA and the Environment Agency's "Model Procedures for the Management of Land Contamination, CLR 11", or any subsequent version or additional regulatory guidance.

 

 

[Note: This condition must be formally discharged by the Local Planning Authority before the submission of details pursuant to the remediation scheme condition that follows]

 

10

Should Land Contamination Remediation Works be identified as necessary under the above condition, no development shall take place until a detailed remediation scheme to bring the site to a condition suitable for the intended use has been submitted to and approved by the Local Planning Authority. The development shall be carried out in accordance with the approved remediation scheme unless otherwise agreed in writing by the Local Planning Authority. The remediation scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures and any necessary long term maintenance and monitoring programme. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 or any subsequent version, in relation to the intended use of the land after remediation.

[Note: This condition must be formally discharged by the Local Planning Authority before the submission of details pursuant to the verification report condition that follows]

 

11

Following completion of measures identified in the approved remediation scheme and prior to the first use or occupation of the development, a verification report that demonstrates the effectiveness of the remediation carried out must be produced together with any necessary monitoring and maintenance programme and copies of any waste transfer notes relating to exported and imported soils shall be submitted to the Local Planning Authority for approval. The approved monitoring and maintenance programme shall be implemented.

 

12

In the event that any evidence of potential contamination is found at any time when carrying out the approved development that was not previously identified in the approved Phase 2 report, it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with a methodology previously approved by the Local Planning Authority. Following completion of measures identified in the approved remediation scheme, a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with the immediately above condition. 

 

13

No work to construct the house hereby approved shall take place  until all the buildings shown on drawing number 956/10 have been demolished and all resulting debris removed from the application site and adjoining land in the applicants ownership, as identified on drawing number 1268 01A.

 

14

No construction works above ground level shall have taken place until documentary and photographic details of the types and colours of the external finishes have been submitted to and approved by the Local Planning Authority, in writing, prior to the commencement of the development. The development shall be implemented in accordance with such approved details.

 

15

Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995 as amended (or any other Order revoking, further amending or re-enacting that Order) no extensions, roof enlargements, buildings and means of enclosure generally permitted by virtue of Classes A, B and E of Part 1, Schedule 2 to the Order shall be undertaken without the prior written permission of the Local Planning Authority.

 