Planning Application ref EPF/2696/13 - Former Electrical Substation, Station Way, Buckhurst Hill, IG9 - Demolition of existing Substation and facilities building, and erection of 2/3 storey block of 9no. 2 bed and 2no. 1 bed flats with associated car parking.

(Director of Planning and Economic Development) To consider the attached report.

Minutes:

The Committee considered an application for a block of  flats on the former site of an electricity substation in Station Way, Buckhurst Hill which had been referred to the committee by Area Planning Subcommittee South at its meeting on 5 March 2015. The application had been referred with no recommendation, The committee therefore considered the application afresh.

 

The committee heard from an objector, the local Parish Council and the applicants agent.

 

The Committee concurred with the view of officers that the application was of acceptable design and granted the proposal subject to local members and the parish council being consulted over the final finishes to the building and the landscaping scheme.

 

Resolved:

 

That planning application EPF/2696/13 at the Former Electrical Substation, Station Way, Buckhurst Hill be granted subject to the following conditions:

 

1          The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this notice.

 

2          No construction works above ground level shall take place until documentary and photographic details of the types and colours of the external finishes have been submitted to and approved by the Local Planning Authority, in writing. The development shall be implemented in accordance with such approved details.

 

3          The development hereby permitted will be completed strictly in accordance with the approved drawings nos: FBE_010; FBE_100 rev. A; FBE_101 rev. A; FBE_102 rev. A; FBE_103 rev. A; FBE_104 rev. A; FBE_200 rev. A; FBE_201; FBE_210 rev. A; FBE_211 rev. A. 

 

4          No development shall take place, including site clearance or other preparatory work, until full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) have been submitted to an approved in writing by the Local Planning Authority. These works shall be carried out as approved. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place, unless the Local Planning Authority gives its written consent to any variation.

 

5          No development, including works of demolition or site clearance, shall take place until a Tree Protection Plan and Arboricultural Method Statement in accordance with BS: 5837:2005 (Trees in relation to construction) has been submitted to the Local Planning Authority and approved in writing. The development shall be carried out only in accordance with the approved Tree Protection Plan and Arboricultural Method Statement unless the Local Planning Authority gives its written consent to any variation.

 

6          No development shall take place until a Phase 1 Land Contamination investigation has been carried out. A protocol for the investigation shall be submitted to and approved in writing by the Local Planning Authority before commencement of the Phase 1 investigation. The completed Phase 1 report shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of any necessary Phase 2 investigation. The report shall assess potential risks to present and proposed humans, property including buildings, crops, livestock, pets, woodland and service lines and pipes, adjoining land, groundwaters and surface waters, ecological systems, archaeological sites and ancient monuments and the investigation must be conducted in accordance with DEFRA and the Environment Agency's "Model Procedures for the Management of Land Contamination, CLR 11", or any subsequent version or additional regulatory guidance.

 

[Note: This condition must be formally discharged by the Local Planning Authority before the submission of details pursuant to the Phase 2 site investigation condition that follows]

 

7          Should the Phase 1 Land Contamination preliminary risk assessment carried out under the above condition identify the presence of potentially unacceptable risks, no development shall take place until a Phase 2 site investigation has been carried out. A protocol for the investigation shall be submitted to and approved by the Local Planning Authority before commencement of the Phase 2 investigation. The completed Phase 2 investigation report, together with any necessary outline remediation options, shall be submitted to and approved by the Local Planning Authority prior to any redevelopment or remediation works being carried out. The report shall assess potential risks to present and proposed humans, property including buildings, crops, livestock, pets, woodland and service lines and pipes, adjoining land, groundwaters and surface waters, ecological systems, archaeological sites and ancient monuments and the investigation must be conducted in accordance with DEFRA and the Environment Agency's "Model Procedures for the Management of Land Contamination, CLR 11", or any subsequent version or additional regulatory guidance.

 

[Note: This condition must be formally discharged by the Local Planning Authority before the submission of details pursuant to the remediation scheme condition that follows]

 

8          Should Land Contamination Remediation Works be identified as necessary under the above condition, no development shall take place until a detailed remediation scheme to bring the site to a condition suitable for the intended use has been submitted to and approved by the Local Planning Authority. The development shall be carried out in accordance with the approved remediation scheme unless otherwise agreed in writing by the Local Planning Authority. The remediation scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures and any necessary long term maintenance and monitoring programme. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 or any subsequent version, in relation to the intended use of the land after remediation.

[Note: This condition must be formally discharged by the Local Planning Authority before the submission of details pursuant to the verification report condition that follows]

 

9          Following completion of measures identified in the approved remediation scheme and prior to the first use or occupation of the development, a verification report that demonstrates the effectiveness of the remediation carried out must be produced together with any necessary monitoring and maintenance programme and copies of any waste transfer notes relating to exported and imported soils shall be submitted to the Local Planning Authority for approval. The approved monitoring and maintenance programme shall be implemented. 

 

10        In the event that any evidence of potential contamination is found at any time when carrying out the approved development that was not previously identified in the approved Phase 2 report, it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with a methodology previously approved by the Local Planning Authority. Following completion of measures identified in the approved remediation scheme, a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with the immediately above condition. 

 

11        No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for:

 

1.         The parking of vehicles of site operatives and visitors

2.         Loading and unloading of plant and materials

3.         Storage of plant and materials used in constructing the development

4.         The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate

5.         Measures to control the emission of dust and dirt during construction, including wheel washing.

6.         A scheme for recycling/disposing of waste resulting from demolition and construction works.

 

12        No development shall take place until details of levels have been submitted to and approved by the Local Planning Authority showing cross-sections and elevations of the levels of the site prior to development and the proposed levels of all ground floor slabs of buildings, roadways and accessways and landscaped areas. The development shall be carried out in accordance with those approved details.

 

13        Prior to first occupation of the development hereby approved, the proposed window openings in the east facing flank elevations shall be entirely fitted with obscured glass and have fixed frames to a height of 1.7 metres above the floor of the rooms in which the windows are installed and shall be permanently retained in that condition.

 

14        Prior to first occupation of the proposed development, the Developer shall be responsible for the provision and implementation of a Travel Information and Marketing Scheme for sustainable transport approved by Essex County Council. 

 

15        Prior to first occupation of the development, the proposed private drive shall be constructed to a minimum width of 5.5 metres for at least the first 6 metres within the site, tapering down to any lesser width.

 

16        The proposed development shall not be occupied until such time as the vehicle parking area indicated on the approved plans, including any parking spaces for the mobility impaired, has been hard surfaced, sealed and marked out in parking bays.  The vehicle parking area shall be retained in this form at all times.  The vehicle parking shall not be used for any purpose other than the parking of vehicles that are related to the use of the development unless otherwise agreed with the Local Planning Authority.

 

17        The gradient of the proposed vehicular access shall be not steeper than 4% (1in 25) for the first 6 metres from the carriageway edge. 

 

18        Any gates provided at the vehicular access shall be inward opening only and shall be set back a minimum of 6 metres from the nearside edge of the carriageway. 

 

19        The development hereby approved shall not be commenced until details of the proposed refuse store indicated on drawing number FBE_100 rev. A have been submitted to and approved in writing by the Local Planning Authority.  The development shall be carried out in accordance with the approved details unless otherwise agreed in writing by the Local Planning Authority.

 

20        All construction/demolition works and ancillary operations, including vehicle movement on site which are audible at the boundary of noise sensitive premises, shall only take place between the hours of 07.30 to 18.30 Monday to Friday and 08.00 to 13.00 hours on Saturday, and at no time during Sundays and Public/Bank Holidays unless otherwise agreed in writing by the Local Planning Authority.

 

21        All bedrooms within the development hereby approved shall be provided with sufficient double glazing and acoustically treated trickle ventilators, or other means of ventilation that will provide adequate ventilation with the windows closed, to ensure that the occupiers are provided with reasonable resting/sleeping conditions with reference to British Standard BS8233: 1999 - Sound insulation and noise reduction for buildings - Code of practice (or such other standard which may supersede it from time to time)

 

22        Details of the double glazing and acoustically treated trickle ventilators, or other means of ventilation, referred to in Condition No 21 shall be submitted to and agreed in writing by the Local Planning Authority and installed before any of the proposed residential development is occupied.