Agenda item

Planning Application - EPF/1549/18 - Racedale, Tylers Road, Roydon, Essex, CM19 5LJ

To consider the attached report on the demolition of existing dwelling and erection of two detached dwellings ** SAC case now progressing **.

 

 

Minutes:

APPLICATION No:

EPF/1549/18

 

SITE ADDRESS:

Racedale

Tylers Road

Roydon

Essex

CM19 5LJ

 

PARISH:

Roydon

 

WARD:

Broadley Common, Epping Upland and Nazeing

 

 

DESCRIPTION OF PROPOSAL:

Demolition of existing dwelling and erection of two detached dwellings

 

DECISION:

Grant Permission (Subject to Legal Agreement)

 

Click on the link below to view related plans and documents for this case:

http://planpub.eppingforestdc.gov.uk/NIM.websearch/ExternalEntryPoint.aspx?SEARCH_TYPE=1&DOC_CLASS_CODE=PL&FOLDER1_REF=610393

 

CONDITIONS

 

1.    The development hereby permitted must be begun not later than the expiration of three years beginning with the date of this notice.

 

2.    The development hereby permitted will be completed strictly in accordance with the approved drawings nos: CA 0318.01, 02, 03, 04, 05 & 06

 

3.    Samples of the types and colours of the external finishes shall be submitted to and approved by the Local Planning Authority in writing prior to their use on site. The development shall be implemented in accordance with such approved details. For the purposes of this condition, the samples shall only be made available for inspection by the Local Planning Authority at the planning application site itself.

 

4.    No development shall commence until an assessment of the risks posed by any contamination, carried out in accordance with British Standard BS 10175: Investigation of potentially contaminated sites - Code of Practice and the Environment Agency's Model Procedures for the Management of Land Contamination (CLR 11) (or equivalent British Standard and Model Procedures if replaced), shall have been submitted to and approved in writing by the local planning authority. If any contamination is found, a report specifying the measures to be taken, including the timescale, to remediate the site to render it suitable for the approved development shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures and timescale and a verification report shall be submitted to and approved in writing by the local planning authority. If, during the course of development, any contamination is found which has not been previously identified, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.

 

5.    Following completion of the measures identified in the approved remediation scheme, and prior to the first use or occupation of the development, a verification report that demonstrates the effectiveness of the remediation carried out must be produced together with any necessary monitoring and maintenance programme and copies of any waste transfer notes relating to exported and imported soils shall be submitted to the Local Planning Authority for approval. The approved monitoring and maintenance programme shall be implemented. 

 

6.    In the event that any evidence of potential contamination is found at any time when carrying out the approved development that was not previously identified in the Phase 2 report, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 21 days of the report being completed and approved in writing by the local planning authority.

 

7.    If any tree, shrub or hedge shown to be retained in the submitted Arboricultural reports is removed, uprooted or destroyed, dies, or becomes severely damaged or diseased during development activities or within 3 years of the completion of the development, another tree, shrub or hedge of the same size and species shall be planted within 3 months at the same place, unless the Local Planning Authority gives its written consent to any variation. If within a period of five years from the date of planting any replacement tree, shrub or hedge is removed, uprooted or destroyed, or dies or becomes seriously damaged or defective another tree, shrub or hedge of the same species and size as that originally planted shall, within 3 months, be planted at the same place.

 

8.    Prior to any above ground works, full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) shall be submitted to and approved in writing by the Local Planning Authority. These works shall be carried out as approved. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place, unless the Local Planning Authority gives its written consent to any variation

 

9.    No development, including works of demolition or site clearance, shall take place until a Tree Protection Plan, Arboricultural Method Statement and site monitoring schedule in accordance with BS:5837:2012 (Trees in relation to design, demolition and construction - Recommendations) has been submitted to the Local Planning Authority and approved in writing. The development shall be carried out only in accordance with the approved documents unless the Local Planning Authority gives its written consent to any variation.

 

10.  Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

11.  Prior to preliminary ground works taking place, details of surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with such agreed details.

 

12.  No preliminary ground works shall take place until a flood risk assessment and management and maintenance plan shall be submitted to and approved by the Local Planning Authority prior to commencement of development. The assessment shall include calculations of increased run-off and associated volume of storm detention using WinDes or other similar best practice tool. The approved measures shall be carried out prior to the substantial completion of the development and shall be adequately maintained in accordance with the management and maintenance plan.

 

13.  Prior to any above groundworks, details and location of the parking spaces (including garages) equipped with active and/or passive Electric Vehicle Charging Point(s) shall have been submitted to and approved in writing with the Local Planning Authority (LPA), unless otherwise agreed in writing with the LPA. The installation of EVCP shall be completed in accordance with the approved details and made operational prior to first occupation. The details shall include: - Location of active and passive charging infrastructure; - Specification of charging equipment; and - Operation/management strategy. The council will expect that a management plan for the charging points is set out clearly. This will address:

a) Which parking bays will have active and/or passive charging provision, including disabled parking bays;

b) How charging point usage will be charged amongst users;

c) The process and the triggers for identifying when additional passive charging points will become activated; and

d) Electricity supply availability. The electricity supply should be already confirmed by the Network Provider so that the supply does not need to be upgraded at a later date

 

14.  Prior to first occupation of the development, a scheme to enhance the ecological value of the site shall be submitted to and agreed in writing by the Local Planning Authority. The ecological value shall be quantified using the Biodiversity Impact Assessment Calculator (BIAC) where appropriate. The scheme shall be implemented in full prior to the occupation of the development hereby approved.

 

15.  Prior to any above groundworks, a strategy to facilitate super-fast broadband for future occupants of the site shall have been submitted to and approved in writing by the Local Planning Authority (LPA). The strategy shall seek to ensure that upon occupation of a dwelling, either a landline or ducting to facilitate the provision of a broadband service to that dwelling from a site-wide network, is in place and provided as part of the initial highway works and in the construction of frontage thresholds to dwellings that abut the highway, unless evidence is put forward and agreed in writing by the LPA that technological advances for the provision of a broadband service for the majority of potential customers will no longer necessitate below ground infrastructure. The development of the site shall be carried out in accordance with the approved strategy unless otherwise agreed in writing by the LPA.

 

16.  The proposed new roof light shall be of the conservation type and shall be installed so that it is not any higher than the surrounding roof tiles.

 

17.  Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any other order revoking and re-enacting that order) no development permitted by virtue of any Class A, AA, B, or E within Part 1 of schedule 2 shall be undertaken, without the prior written agreement of the Local Planning Authority.

 

18.  All construction/demolition works and ancillary operations, including vehicle movement on site which are audible at the boundary of noise sensitive premises, shall only take place between the hours of 07.30 to 18.30 Monday to Friday and 08.00 to 13.00 hours on Saturday, and at no time during Sundays and Public/Bank Holidays unless otherwise agreed in writing by the Local Planning Authority.

 

19.  No development shall take place, including any demolition works, until a construction management plan or construction method statement has been submitted to and approved in writing by the Local Planning Authority. The approved plan/statement shall be adhered to throughout the demolition/construction period. The plan/statement shall provide for:

 

-24 hour emergency contact number;

-Hours of operation;

-Parking of vehicle of site operatives and visitors (including measures taken to ensure satisfactory access and movement for existing occupiers of neighbouring properties during construction);

-Routes for construction traffic;

-Locations for loading/unloading and storage of plant, waste and construction materials;

-Method of preventing mud being carried onto the highway;

-Measures to protect vulnerable road users (cyclists and pedestrians)

      -Any necessary temporary traffic management measures;

      -Arrangements for turning vehicles;

      -Arrangements to receive abnormal loads or unusually large vehicles;

-Methods of communicating the Construction Management Plan to staff, visitors and neighbouring residents and businesses.