Agenda item

Planning Application - EPF/0212/21 10 Barncroft Green, Loughton IG10 3ET

To consider the attached report for a proposed new dwelling and alterations to fenestration on existing house. **SAC CASE NOW PROGRESSING**

Minutes:

APPLICATION No:

EPF/0212/21

 

SITE ADDRESS:

10 Barncroft Green

Loughton

IG10 3ET

 

PARISH:

Loughton

 

WARD:

Loughton Roding

 

 

DESCRIPTION OF PROPOSAL:

Proposed new dwelling and alterations to fenestration on existing house. **SAC CASE NOW PROGRESSING**

 

DECISION:

Grant Permission (With Conditions) Subject to Legal Agreement

 

Click on the link below to view related plans and documents for this case:

http://planpub.eppingforestdc.gov.uk/NIM.websearch/ExternalEntryPoint.aspx?SEARCH_TYPE=1&DOC_CLASS_CODE=PL&FOLDER1_REF=647521

 

CONDITIONS

1

The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

2

The development hereby permitted shall be carried out and retained strictly in accordance with the following approved plans: D01, D02, D03, D04, D05, D06, D07, D08, D09, D10, D11, D12, D13, and D14.

 

3

A) No work on any phase of the development (with the exception of demolition works where this is for the reason of making areas of the site available for site investigation), shall commence until an assessment of the risks posed by any contamination within that phase shall have been submitted to and approved in writing by the Local Planning Authority. This assessment must be undertaken by a suitably qualified contaminated land practitioner, in accordance with British Standard BS 10175: Investigation of Potentially Contaminated Sites - Code of Practice and the Environment Agency's Guidelines for the Land Contamination: Risk Management (LCRM 2020) (or equivalent if replaced), and shall assess any contamination on the site, whether or not it originates on the site. The development shall only be carried out in accordance with the approved details unless the Local Planning Authority gives its written consent to any variation. The assessment shall include: (1) A survey of the extent, scale and nature of contamination and (2) An assessment of the potential risks to: human health; property (existing or proposed) including buildings, crops, livestock, pets, woodland, service lines and pipes; adjoining land; groundwater and surface waters; ecological systems; and archaeological sites and ancient monuments.

 

B) If following the risk assessment unacceptable risks are identified from land affected by contamination in that phase, no work on any phase of the development shall take place, until a detailed land remediation scheme has been completed. The scheme will be submitted to and approved in writing by the local planning authority. The scheme shall include an appraisal of remediation options, identification of the preferred option(s), the proposed remediation objectives and remediation criteria, and a description and programme of the works to be undertaken including the verification plan. (The remediation scheme shall be sufficiently detailed and thorough to ensure that after remediation, as a minimum, land should not be capable of being determined as contaminated land under Part IIA of the Environmental Protection Act 1990). The development shall only be carried out in accordance with the approved scheme. Following the completion of the remediation works and prior to the first occupation of the development, a verification report by a suitably qualified contaminated land practitioner shall be submitted to and approved in writing by the local planning authority.

 

4

Prior to preliminary ground works taking place, details of surface water disposal shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details, and shall be provided on site prior to the first occupation and shall be retained for the lifetime of the development.

 

5

Prior to any above ground works, full details of both hard and soft landscape works (including tree planting) and implementation programme (linked to the development schedule) shall be submitted to and approved in writing by the Local Planning Authority. All hard and soft landscape works shall be carried out in accordance with the approved details. The works shall be carried out prior to the occupation of the building or completion of the development, whichever is the sooner. The hard landscaping details shall include, as appropriate, and in addition to details of existing features to be retained: proposed finished levels or contours; means of enclosure; car parking layouts; other minor artefacts and structures, including signs and lighting and functional services above and below ground. The details of soft landscape works shall include plans for planting or establishment by any means and full written specifications and schedules of plants, including species, plant sizes and proposed numbers /densities where appropriate. If within a period of five years from the date of the planting or establishment of any tree, or shrub or plant, that tree, shrub, or plant or any replacement is removed, uprooted or destroyed or dies or becomes seriously damaged or defective another tree or shrub, or plant of the same species and size as that originally planted shall be planted at the same place.

 

6

Prior to any above groundworks, details and location of the parking spaces (including garages) equipped with active Electric Vehicle Charging Point(s) shall have been submitted to and approved in writing with the Local Planning Authority (LPA), unless otherwise agreed in writing with the LPA. The installation of EVCP shall be completed in accordance with the approved details and made operational prior to first occupation. The details must include details as follows: 

 

- Location of active charging infrastructure; and

- Specification of charging equipment to be used.

 

7

Prior to any above groundworks, a strategy to facilitate super-fast broadband for future occupants of the site shall have been submitted to and approved in writing by the Local Planning Authority (LPA). The strategy shall seek to ensure that upon occupation of a dwelling, either a landline or ducting to facilitate the provision of a broadband service to that dwelling from a site-wide network, is in place and provided as part of the initial highway works and in the construction of frontage thresholds to dwellings that abut the highway, unless evidence is put forward and agreed in writing by the LPA that technological advances for the provision of a broadband service for the majority of potential customers will no longer necessitate below ground infrastructure. The development of the site shall be carried out in accordance with the approved strategy.

 

8

Prior to first occupation of the development, measures shall be incorporated within the development to ensure a water efficiency standard of 110 litres (or less) per person per day.

 

9

Prior to first occupation of the development, a scheme to enhance the ecological value of the site shall be submitted to and agreed in writing by the Local Planning Authority. The ecological value shall be quantified using the Biodiversity Impact Assessment Calculator (BIAC) where appropriate. The scheme shall be implemented in full prior to the occupation of the development hereby approved.

 

10

The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those in the existing building (10 Bancroft Green), except those specified in the submitted application form.

 

11

Wheel washing or other cleaning facilities for vehicles leaving the site during construction works shall be installed and utilised to clean vehicles immediately before leaving the site. Any mud or other material deposited on nearby roads as a result of the development shall be removed.

 

12

No deliveries, external running of plant and equipment or demolition and construction works, other than internal works not audible outside the site boundary, shall take place on the site other than between the hours of 07:30 to 18:00 on Monday to Friday and 08:00 to 13:00 on Saturday and not at all on Sundays, Public or Bank Holidays.

 

13

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any other order revoking and re-enacting that order) no development permitted by virtue of Classes A, AA, B, D & E of Part 1 to schedule 2 shall be undertaken, without the prior written agreement of the Local Planning Authority.

 

14

Prior to the first occupation of the development, the Developer shall be responsible for the provision, implementation and distribution of a Residential Travel information Pack for sustainable transport, approved by Essex County Council, to include six one day travel vouchers for use with the relevant local public transport operator. This pack (including tickets) shall be provided by the Developer to the residents of the new dwelling free of charge.

 

Supporting documents: